GE Services personnel have previously Project Managed the delivery of the 33kV reinforcement scheme in Winchester, overseeing the entire process from design approval through to energisation and completion. Key responsibilities included:
- Coordination with Local Authorities: Liaised with Local Highways Authorities to manage the scheme route, secure necessary permits, and implement traffic management, diversions, and road closures.
- Community Engagement: Engaged with local residents to inform them about the project, explaining the reasons for the scheme and how the works would be carried out.
- Site Safety Management: Ensured that a safe site setup was maintained throughout the construction phase, prioritising the safety of all personnel and the public.
- Client Communication: Maintained continuous communication with the client, providing regular progress updates and identifying value engineering solutions where possible to enhance project efficiency.
- Cable Route Testing: Managed the testing of the cable route following installation, ensuring all standards were met before handing over to the client for energisation.
- Energisation Support: Supported the client during the energisation and commissioning phase, ensuring a smooth transition to full operational status.
This project highlights GE Services’ commitment to delivering high-quality electrical infrastructure projects, with a strong focus on safety, efficiency, and stakeholder collaboration.